Since 2024 · Aydın

Our Services

Solar Energy Systems

Rooftop and ground-mount PV: feasibility, EPDK/TEDAŞ process, structural fitness, install, and acceptance — one team.

Solar

We connect generation within the legal frame.

Unlicensed generation follows EPDK rules, interconnection follows TEDAŞ, rooftop loads follow Ministry of Environment and Urbanization structural rules.

PV plants cut energy cost and sit inside a permit chain. Unlicensed generation is run under the EPDK Unlicensed Electricity Generation Regulation; grid integration is audited to TEDAŞ standards.

Seettech models yield and shading in PVSyst and selects modules, inverters, and structure from that model. Call letter, electrical and structural approvals, and provisional acceptance are tracked for the client.

A bidirectional meter and netting connection are legal safeguards. Roof install does not start without snow/wind and uplift calculations.

Request a survey →
5 MW+ Installed capacity
EPDK Unlicensed frame
25 years Module life
Static report Rooftop mandate

System types

PV fitted to the need

On-grid

Grid-tied generation and bill netting.

Off-grid

Battery storage, independent of the grid.

Hybrid

Grid plus storage; outage and yield balance.

Rooftop

Structural fit, wind deflectors, watertight mounting.

Ground mount

Soil, fence, inverter station, MV connection.

Monitoring

Yield, faults, and performance tracking.

Process

PV installation steps

  1. Site

    Irradiation, roof/land, and load profile.

  2. Design

    PVSyst, equipment, electrical/static project.

  3. Permits

    Call letter, TEDAŞ / OSB approvals.

  4. Commission

    Install, meter, provisional acceptance.

Let’s run your PV feasibility.

After survey, yield, permit path, and investment summary are clear.

Request a survey →